International Journal of Advanced Innovative Technology in Engineering (IJAITE)



Fabrication & Testing Of Duct Air Cooler

Dr. Kirti Khandelwal, Sheikh Nawaz, Amin Khan, Shreyash Singh, Hassan Musharraf, Hiralal Jangid

Abstract :

The main objective of this project is fabricating the duct system for central Air-conditioning system in a classroom no. ME02. The central air-conditioning system controls the building temperature, humidity, and cleanness, proper air distribution, noise level, & comfort level. Also, this project deals with duct designing for fresh air ventilation, exhaust air duct, return air duct and equipment selection such as Air handling unit, and fan coil unit based on requirement.

Keywords :

Full Text :

Download PDF

DOI :

Cite this paper :

References :